Electrical Testing and Intelligent Operations & Maintenance Services

发布时间:2025-12-30


Electrical preventive testing is an essential measure for determining whether power equipment can continue to be put into service, preventing losses to electrical equipment, and ensuring the safe operation of the power system. It also constitutes an effective method and the optimal approach for obtaining critical information about the condition of electrical equipment. Accordingly, China mandates that all equipment in the power system undergo preventive testing in accordance with the requirements set forth in the Power Industry’s “Regulations on Preventive Testing of Electrical Equipment,” thereby proactively mitigating potential risks.

These primarily include: transformers, switches, surge arresters, power cables, insulated conductors, relay protection equipment, grounding systems, instrument transformers, capacitors, reactors and arc-suppression coils, as well as high-voltage disconnect switches and fuses.

 

1. For user‑side electrical equipment and distribution rooms (including 220 kV and lower‑voltage switchgear and packaged substations), perform handover and preventive testing of high‑ and low‑voltage equipment, conduct relay protection tests, and carry out cleaning and maintenance of all types of equipment. Through these tests and cleaning activities, assess the operational status of the equipment, promptly identify operational defects, and propose appropriate recommendations for defect elimination.

2. Emergency repair of distribution equipment and lines: The primary task of the emergency repair team is to promptly address sudden faults in customer power supply—including distribution rooms and overhead lines—efficiently resolving issues in the shortest possible time and restoring power without delay.

3. The primary tasks of the intelligent transformation and upgrade team are to modernize and upgrade distribution rooms (including packaged substations), enabling smart data collection, online digital management, equipment lifecycle tracking, fault early warning, and energy management. Meanwhile, an on-site specialist team provides professional electricity‑use services, delivering customers more reliable, energy‑efficient, and secure power supply.

4. Substation maintenance and operation services primarily involve acting on behalf of users to provide on-site monitoring or conduct regular inspections of their substations.

 

Test subject

Test Items

Transformer

Infrared thermography inspection

Dissolved Gas Analysis in Oil

High-Frequency Partial Discharge Detection

Core Ground Current Measurement

Bushings, CT/PT, coupling capacitors

Infrared thermography inspection

High-Frequency Partial Discharge Detection

Relative dielectric loss factor

Relative capacitance ratio

Lightning arrester

Infrared thermography inspection

High-Frequency Partial Discharge Detection

Continuous Current Monitoring During Operation

GIS ontology

Infrared thermography inspection

Ultra-High Frequency Partial Discharge Detection

Ultrasonic Partial Discharge Detection

SF6 gas humidity

SF6 gas purity

SF6 gas decomposition products

SF6 Gas Leak Imaging Detection

Switchgear cabinet

Infrared thermography inspection

Ultrasonic Partial Discharge

Transient Voltage Detection

High-voltage cable

Infrared thermography inspection

Grounding current of the outer sheath

High-frequency partial discharge, ultra-high-frequency partial discharge, and ultrasonic partial discharge detection for cable terminations and intermediate joints.

 

(1) Yangling, Yingcheng – Huaneng Guanyun Photovoltaic Maintenance

 

 

 

 

(2) Photovoltaic Maintenance at Zhongguanyi, Macheng

(3) Enshi Hydropower Test

 

 

 

(4) Withstand Voltage Test at the Xiantao China Resources Power Plant

 

 

 

(4) Electrical Equipment Testing for Unit 2 of Huaneng Yingcheng Combined Heat and Power Plant

 

 

 

 

 

(5) Inspection of electrical and thermal control systems at Huaneng Yingcheng Combined Heat and Power Plant

 

 

 

 

(6) Electrical Testing for the Huaneng Xianning Tiancheng Xiangshan 200 MW Photovoltaic Project in Hubei Province

 

 

 

 

 

(7) Hubei Huanggang Power Supply Company Online Monitoring System

 

 

 

(8) Preventive Testing of the Suizhou 100 MW Photovoltaic Step-Up Substation

 

 

 

 

 

 

(9) On-site AC Withstand Voltage Test at Liaohe Oilfield

 

 

 

Honors and Qualifications:

 

Level-2 General Contractor for Power Engineering Construction

 

 

Construction labor service qualifications are not graded.

 

Class III Installation and Maintenance, Class II Testing

 